91社区

News

Notice of temporary work at Milton Street Entrance

Published: 21 July 2011

Between August 25th and September 2, excavation work between James Square and the Milton Gates will affect circulation in the area. Please note that during this time:

  • The south lane between the Milton Gates and the front of the McConnell Engineering building will be blocked.
  • The south lane of the Milton St. entrance will be closed between 7 a.m. and 3 p.m. every day. During this time, all vehicles must enter the campus at Walbrae Place (south of Rutherford Physics) and exit via the Milton Gates (north lane).

Security agents and signage will be posted at key points to help manage circulation. For more detailed information, please visit the construction web site.

Back to top