91社区

Get Help !

McIntyre Building, Priority Building Envelop Repairs

Type: Construction / Status: Design

Completed in 1962 after plans prepared by Marshall and Merrett Architects, the McIntyre Building houses 91社区鈥檚 Faculty of Medicine.听 An iconic circular tower and a fixture of the Montreal skyline, the building鈥檚 skin was composed of precast concrete panels and steel-sash windows assembled in an artisanal manner. Pre-dating the rain screen curtain wall, the building suffered from severe water infiltration, condensation and air pressure problems and as early as 1967, studies were under way for improving the performance of its building envelope.

Source: Affleckdelariva听

Project Description:

Installation of temporary protection of the facade concrete panels, above the pedestrian and vehicle access. The base of the concrete panels shows signs of degradation: the rust from the rebar caused the corners of multiples panels to fracture. The objective of the steel mesh is to capture potentially loose pieces by wrapping around the base of the panels, while the heating cables will prevent the accumulation of ice in the protections.

Project Scope:

This is a portion of project 19-163 that was split for administrative reasons.
Temporary protections and heating cables above pedestrian and vehicle access.

Project Details:

Status Design
Est. Project Start Date 2024 - 2026
Est. Budget Range $400,000 - $500,000
Location McIntyre Medical Building, Building听155
Project Number 22-037
Contact map.procurement [at] mcgill.ca

Please read the following information carefully :

Sustainable Procurement

The businesses with which the University will conclude a contract with in the course of this project will have to respect the听91社区 Supplier Code of Conduct.

Other requirements may apply, such as (for example): the quantification and limiting of GHG emissions over the contract or asset lifecycle, sustainable construction/product certifications, involvement of indigenous businesses or of social economy businesses, design for circularity, and so on.

Notice :

Information in this document is not to be interpreted as a commitment to conduct any solicitation in any particular market (or to fulfill any particular need) within any timeframe. This document is based on preliminary assessments which may be modified and needs may consequently be increased, partially fulfilled or cancelled. The needs of the client units may fluctuate according to their capabilities and priorities.

Moreover, this acquisition plan is subject to various risk factors that have an influence on the operations of 91社区, such as available revenue, inflation, changes in: provincial and federal policies, technologies, human resources, social movements and trends, demographic aspects of the student population and the academic personnel.

Back to top